20MW LUCKY LOW HEAD
HYDROPOWER PROJECT
( MARALA BARRAGE)
The Consultancy Services Include supervision of survey and investigation work conducted on the program prepared by Consultants and Carrying out Feasibility Study of the hydropower project and prepare an acceptable and bankable report of the project covering Feasibility level Design and drawings of each structure, Bill of Quantities, Cost estimates, Powerhouse and Power plant, hydro mechanical, electrical and miscellaneous auxiliary equipment (Technical particulars, numbers, capacity etc.), Economic & Financial Analysis, Environmental Impact Assessment, Workout cost per KWh of power production, Prepare and provide the Hydrological, Geotechnical and Topographical Survey Report, Alternative Layouts and Comparison, IEE Social and Resettlement Report and Feasibility Report.
Date of Commencement: April 2008
Date of Completion: November 2008